Repair water leakage on R.C. soffit using Unifor Crystalline Waterproofing System (Unifor Crystal) at Thomson Medical Centre
Jan 2005Obayashi Corporation
Repair cracks and water leakage on ceiling, soffit & R.C. slab using Unifor Crack Injection System (Epoxy Grouting) and Unifor Underwater Epoxy Grouting Method for One Raffles Quay Project
Feb 2005 - Sep 2005Feng Ming Construction Pte Ltd
Waterproof planter box using Unifor Crystalline Waterproofing System (Unifor Crystal) at Upper Bukit Timah Flyover
Apr 2005East Coast Town Council
Repair hollowness on tiles using Unifor Epoxy Grouting Method, and repair water leakage on construction joint & cracks using Polyurethane Grouting Method at Blk 417 Bedok North Street 1
Mar 2005Hock Guan Cheong Builder Pte Ltd
Repair hollow screed at corridor using Unifor Epoxy Grouting Method (UF Grout) for Kim Keat Ave HDB Upgrading Project
Mar 2005Nishimatsu Construction Co., Ltd
Repair water leakage around core hole on diaphragm wall using Polyurethane Grouting Method for Nicholl Highway MRT CCL C824 Project
Mar 2005 - Jul 2005SembCorp-Daewoo J.V.
Repair honeycomb and I-beam on R.C. soffit inside tunnel using Prepacked Grouting Method, and repair groove line on slip road wall using Pressure Grouting Method for C422 Kallang & Paya Lebar Expressway Project
Apr 2005 - Oct 2005Sato Kogyo (S) Pte Ltd
Waterproof planter box using Unifor Crystalline Waterproofing System (Unifor Crystal) for Proposed Extension of Queensway to AYE Project
Apr 2005 - Jul 2005Premas International Ltd
Repair cracks on brickwall using Unifor Crack Injection System (Epoxy Grouting) at Blk 548 Woodlands Drive 44
Apr 2005Interlink Specialist Pte Ltd
Repair construction joint and waterproof existing staircase wall using Unifor Crystalline Waterproofing System (Unifor Crystal) for Orchard Plaza
May 2005SembCorp Engineers And Constructors Pte Ltd
Wire saw cut concrete wall at C824 Interface for KPE Contract 421 Project
May 2005 - Jul 2005Eng Seng Construction Pte Ltd
Repair water leakage on construction joint inside tunnel shaft using Polyurethane Grouting Method at Bedok Canal for DTSS Tanah Merah Link Sewer Contract Project
Jun 2005Tiong Seng Contractors (Pte) Ltd
Repair water leakage on joint between tunnel and manhole using Polyurethane Grouting Method for DTSS Kim Chuan Link Sewers Contract 1 Project
Jun 2005Tiong Seng Contractors (Pte) Ltd
Repair water leakgae on joint inside tunnel using Polyurethane Grouting Method for DTSS Seletar Link Sewer Contract 1 Project
Jun 2005Greatearth Construction Pte Ltd
Repair dry cracks on R.C. slab at basement carpart using Unifor Crack Injection System for Kovan Melody Condominium Project
Jun 2005Teamcon Pte Ltd
Repair water leakage on cracks & construction joint, and honeycomb on R.C. wall and slab using Polyurethane Grouting Method for One Raffles Quay Project
Jul 2005 - Oct 2005Giftbuild Pte Ltd
Repair water leakage on R.C. wall and soffit using Polyurethane Grouting Method at Bras Basah Complex, Seng Poh Road, Jalan Rajah, Telok Blangah Rise, Lengkok Bahru & Commonwealth Drive
Aug 2005 - Oct 2005Ken-Pal (S) Pte Ltd
Repair water leakage on R.C. wall and soffit using Polyurethane Grouting Method for Amoy Quee Camp Project
Aug 2005Lum Chang Building Contractors Pte Ltd
Repair water leakage on toilet R.C. soffit, brickwall and bedroom soffit using Unifor Crystalline Waterproofing System (Unifor Crystal) for Summerdale Condominium Project
Aug 2005Hock Guan Cheong Builder Pte Ltd
Repair cracks on hollow floor screed at access corridors and void deck using Unifor Epoxy Grouting Method (UF Grout) for Lor Limau Precinct (MUP 18A) Project
Aug 2005 - Sep 2005Econ - NCC J.V.
Repair water leakage on R.C. wall, soffit and slab using Polyurethane Grouting Method for MRT Circle Line C822 Project
Aug 2005 - Dec 2005Chye Joo Construction Pte Ltd
Repair cracks on R.C. slab/beam using Unifor Crack Injection System (Epoxy Grouting) for Bedok Reservoir Fly-over RD107 Project
Sep 2005 - Dec 2005Sato Kogyo (S) Pte Ltd
Grout gap between I-beam and Corbel using Unifor Epoxy Grouting Method for Lorong Chuan Station C852A-CCL3 Project
Sep 2005Takenaka Corporation
Install shortcrete lagging between CBP gaps, and repair water leakage between bored piles using Polyurethane Grouting Method, and repair honeycomb on R.C. column using Non-Shrink Cementitious Grouting Method for LASALLE-SIA Project
Oct 2005 - Jan 2007Takenaka Corporation
Repair cracks on R.C. beam and slab using Unifor Crack Injection System, and repair water leakage on R.C. slab on gutter using Unifor Underwater Epoxy Grouting Method for LASALLE-SIA Project
Oct 2005 - Sep 2006Taisei Corporation
Grout gap between TBM and soil using Polyurethane Grouting Method for MRT CCL3 C853 Project
Oct 2005 - Nov 2005Mak Engineering Pte Ltd
Repair water leakage on joint inside tunnel lining using Polyurethane Grouting Method and Unifor Underwater Epoxy Grouting Method for DTSS Kranji Sewers Contract 05 Project
Oct 2005Sato Kogyo (S) Pte Ltd
Repair cracks and spalling concrete on R.C. floor and grout gap between concrete screed and R.C. slab for Contract ER141 Project