Project Done

Thomson Medical Centre

Repair water leakage on R.C. soffit using Unifor Crystalline Waterproofing System (Unifor Crystal) at Thomson Medical Centre

Jan 2005

Obayashi Corporation

Repair cracks and water leakage on ceiling, soffit & R.C. slab using Unifor Crack Injection System (Epoxy Grouting) and Unifor Underwater Epoxy Grouting Method for One Raffles Quay Project

Feb 2005 - Sep 2005

Feng Ming Construction Pte Ltd

Waterproof planter box using Unifor Crystalline Waterproofing System (Unifor Crystal) at Upper Bukit Timah Flyover

Apr 2005

East Coast Town Council

Repair hollowness on tiles using Unifor Epoxy Grouting Method, and repair water leakage on construction joint & cracks using Polyurethane Grouting Method at Blk 417 Bedok North Street 1

Mar 2005

Hock Guan Cheong Builder Pte Ltd

Repair hollow screed at corridor using Unifor Epoxy Grouting Method (UF Grout) for Kim Keat Ave HDB Upgrading Project

Mar 2005

Nishimatsu Construction Co., Ltd

Repair water leakage around core hole on diaphragm wall using Polyurethane Grouting Method for Nicholl Highway MRT CCL C824 Project

Mar 2005 - Jul 2005

SembCorp-Daewoo J.V.

Repair honeycomb and I-beam on R.C. soffit inside tunnel using Prepacked Grouting Method, and repair groove line on slip road wall using Pressure Grouting Method for C422 Kallang & Paya Lebar Expressway Project

Apr 2005 - Oct 2005

Sato Kogyo (S) Pte Ltd

Waterproof planter box using Unifor Crystalline Waterproofing System (Unifor Crystal) for Proposed Extension of Queensway to AYE Project

Apr 2005 - Jul 2005

Premas International Ltd

Repair cracks on brickwall using Unifor Crack Injection System (Epoxy Grouting) at Blk 548 Woodlands Drive 44

Apr 2005

Interlink Specialist Pte Ltd

Repair construction joint and waterproof existing staircase wall using Unifor Crystalline Waterproofing System (Unifor Crystal) for Orchard Plaza

May 2005

SembCorp Engineers And Constructors Pte Ltd

Wire saw cut concrete wall at C824 Interface for KPE Contract 421 Project

May 2005 - Jul 2005

Eng Seng Construction Pte Ltd

Repair water leakage on construction joint inside tunnel shaft using Polyurethane Grouting Method at Bedok Canal for DTSS Tanah Merah Link Sewer Contract Project

Jun 2005

Tiong Seng Contractors (Pte) Ltd

Repair water leakage on joint between tunnel and manhole using Polyurethane Grouting Method for DTSS Kim Chuan Link Sewers Contract 1 Project

Jun 2005

Tiong Seng Contractors (Pte) Ltd

Repair water leakgae on joint inside tunnel using Polyurethane Grouting Method for DTSS Seletar Link Sewer Contract 1 Project

Jun 2005

Greatearth Construction Pte Ltd

Repair dry cracks on R.C. slab at basement carpart using Unifor Crack Injection System for Kovan Melody Condominium Project

Jun 2005

Teamcon Pte Ltd

Repair water leakage on cracks & construction joint, and honeycomb on R.C. wall and slab using Polyurethane Grouting Method for One Raffles Quay Project

Jul 2005 - Oct 2005

Giftbuild Pte Ltd

Repair water leakage on R.C. wall and soffit using Polyurethane Grouting Method at Bras Basah Complex, Seng Poh Road, Jalan Rajah, Telok Blangah Rise, Lengkok Bahru & Commonwealth Drive

Aug 2005 - Oct 2005

Ken-Pal (S) Pte Ltd

Repair water leakage on R.C. wall and soffit using Polyurethane Grouting Method for Amoy Quee Camp Project

Aug 2005

Lum Chang Building Contractors Pte Ltd

Repair water leakage on toilet R.C. soffit, brickwall and bedroom soffit using Unifor Crystalline Waterproofing System (Unifor Crystal) for Summerdale Condominium Project

Aug 2005

Hock Guan Cheong Builder Pte Ltd

Repair cracks on hollow floor screed at access corridors and void deck using Unifor Epoxy Grouting Method (UF Grout) for Lor Limau Precinct (MUP 18A) Project

Aug 2005 - Sep 2005

Econ - NCC J.V.

Repair water leakage on R.C. wall, soffit and slab using Polyurethane Grouting Method for MRT Circle Line C822 Project

Aug 2005 - Dec 2005

Chye Joo Construction Pte Ltd

Repair cracks on R.C. slab/beam using Unifor Crack Injection System (Epoxy Grouting) for Bedok Reservoir Fly-over RD107 Project

Sep 2005 - Dec 2005

Sato Kogyo (S) Pte Ltd

Grout gap between I-beam and Corbel using Unifor Epoxy Grouting Method for Lorong Chuan Station C852A-CCL3 Project

Sep 2005

Takenaka Corporation

Install shortcrete lagging between CBP gaps, and repair water leakage between bored piles using Polyurethane Grouting Method, and repair honeycomb on R.C. column using Non-Shrink Cementitious Grouting Method for LASALLE-SIA Project

Oct 2005 - Jan 2007

Takenaka Corporation

Repair cracks on R.C. beam and slab using Unifor Crack Injection System, and repair water leakage on R.C. slab on gutter using Unifor Underwater Epoxy Grouting Method for LASALLE-SIA Project

Oct 2005 - Sep 2006

Taisei Corporation

Grout gap between TBM and soil using Polyurethane Grouting Method for MRT CCL3 C853 Project

Oct 2005 - Nov 2005

Mak Engineering Pte Ltd

Repair water leakage on joint inside tunnel lining using Polyurethane Grouting Method and Unifor Underwater Epoxy Grouting Method for DTSS Kranji Sewers Contract 05 Project

Oct 2005

Sato Kogyo (S) Pte Ltd

Repair cracks and spalling concrete on R.C. floor and grout gap between concrete screed and R.C. slab for Contract ER141 Project

Nov 2005 - Dec 2005