Kingsland Development Pte Ltd

Repair water leakage from honeycomb on R.C soffit using Polyurethane Grouting Method c/w Unifor Crystallization system at Jln Jentera Factory.

Jan 11

Marina Bay Sands Pte Ltd

Repair water leakage to Diaphragm wall, R.C Soffit, Construction Joints & around reinforcement bars using Polyurethane Grouting Method at Marina Bay Sands

Jan – Feb 11

Sembawang Engineers & Constructors Pte Ltd

Repair dry crack on R.C Wall & Slab using Unifor Crack Injection System (UF Grout); repair water leakage on R.C Wall & Slab using Unifor Underwater Epoxy Grouting Method (UF Grout UW); repair honeycomb on R.C Wall & Slab using Cementitious Pressure Grouting Method for Resort World Sentosa MC06.

Jan 11 – May 12

Kian Hiap Construction Pte Ltd

Repair water leakage from cracks, construction joint & honeycomb on Diaphragm wall using Polyurethane Grouting Method at Alexis Condominium.

Feb – Mar 11

Sato Kogyo (S) Pte Ltd

Repair cracks on Soffit R.C. Slab and column using Unifor Crack Injection System (Epoxy Grouting) for International Cruise Project.

Feb 11 – Mar 12

CEC Engineering Pte Ltd

Repair water leakage from cracks on R.C Soffit slab at Marina IR (North Podium) Project using Polyurethane Grouting\r\nMethod and repair honeycomb at R.C Lift Core Wall using Pressure Grouting Method at OUB Centre.

Feb 11

McConnell Dowell (SEA) Pte Ltd

Repair cracks on R.C Wall Panel at current training wall using Underwater Epoxy Grouting Method at International Cruise Terminal.

Mar 11

Taisei Corporation

Repair water leakages on diaphragm wall inside cut and cover station using Polyurethane Grouting Method for CCL C854, Farrer Station Project.

Mar – Jun 11

Orchard 290 Ltd

Install Seal onto the expansion joint using Zealseal c/w epoxy mortar and center ball at 6th Floor Level Garden Area.

Mar – Apr 11

Civil Aviation Authority of Singapore

Repair water Leakage on Construction Joint using Polyurethane Grouting at Changi Airport Terminals Project.

Mar – Jul 11

Sato Kogyo (S) Pte Ltd

Grout gap between crane rail and beam at SATU (bay 2, 3 & 4) using Unifor Epoxy Grouting Method for Rolls-Royce Building.

Apr 11 – Jun 11

Toh Teck Seng Engineering & Construction

Repair water leakage surrounding the cable on basement RC wall using Polyurethane Grouting Method in Jurong Island at Exxonmobil.

Apr – May 11

Crystal Fowntains (D&P) Pte Ltd

Core hole on R.C. Wall, and pressure grout gap between pipe and R.C. wall after installation of pipe using non-shrink cementitious grout c/w underwater epoxy mortar for Sentosa MC06 Gondola Canal Project.

Apr – May 11

Kajima Overseas Asia Pte Ltd

Repair dry cracks on R.C. slab using Unifor Crack Injection System (Epoxy Grouting); repair water leakage from cracks and honeycomb on R.C. slab using Unifor Underwater Epoxy Grouting method for SGH Pathology Building Project.

Apr 11 – May 13

Capstone Construction Pte Ltd

Repair honeycomb on R.C. wall and slab using Pressure grouting method (non-shrink cementitious grout) for Bethel Church Project.

Apr – Aug 11

Marina Properties

Repair water leakage on R.C soffit slab using Polyurethane grouting method for Millenia Walk, Ritz Carlton, Millennia Tower Project.

May 11 – Jul 12

Samsung-Tiong Seng JV

Repair dry cracks on R.C. wall using Unifor Crack Injection System (Epoxy Grouting) for The Connexion Project.

June 11 – Jan 14

Chosuk Construction & Development Pte Ltd

Repair water leakage from secant pile at shaft A using polyurethane grouting method for MRT Downtown Line C915 Project.

June 11

Incorporated Builders Pte Ltd

Repair water leakage from downpipe on R.C. slab using Polyurethane Grouting Method for Singapore Polytechnic Project.

June 11

Corrosion Proof Construction (Asia) Pte Ltd

Repair dry cracks on R.C. slab test bed using Unifor Crack Injection System (Epoxy Grouting) to Rolls Royce Building at Seletar.

June – Aug 11

Eng Lee Engineering Pte Ltd

Grout water leakage on cracks inside segment tunnel using Polyurethane Grouting Method and Unifor Crack Injection System (UF Grout UW) at Tuas Project.

July – Dec 11

Keong Hong Construction Pte ltd

Repair Hollow Marble using Unifor Epoxy Grouting Method for No.8 Woodleigh Close Condominium Project.

Aug 11

Dongah Geological Engineering Co Ltd

Repair water leakage on diaphragm wall inside cut and cover tunnel using Polyurethane Grouting Method for MCE C482.

Sep 11 – Mar 12

Loh & Loh Construction Pte Ltd

Repair dry cracks on R.C soffit slab using Unifor Crack Injection System (Epoxy Grouting Method) and water leakage on construction joint and R.C soffit slab using Unifor Underwater Epoxy Grouting Method for SLNG Jurong Island Project.

Sep – Nov 11

Kimly Construction Pte Ltd

Repair water leakage from cracks / construction joints and honeycomb on R.C slab and wall using Unifor Underwater Epoxy Grouting Method and Polyurethane Grouting Method for the Pavilion Project.\r\n

Oct 11 – Nov 11

Takenaka –Singapore Piling JV

Grout gap between R.C hole/reinforcement bar and steel pile using Epoxy Grouting Method and Non-Shrink Cementitious Grouting Method for the National Art Gallery.

Oct 11 – May 15

Sato Kogyo (S)Pte Ltd

Enlarge columns at Block D using Pre-pack Grouting Method (Non-Shrink Cementitious Grout); repair wet cracks on R.C water tank using Polyurethane Grouting Method; repair dry cracks on R.C slab using Unifor Crack Injection System (Epoxy Grouting) for the PLAZA Project.

Nov 11 – Dec 13

Prima Food Pte Ltd

Repair cracks on R.C slab using Unifor Crack Injection System Epoxy Grouting Method for Prima Annex Building .

Oct – Dec 11

JCP Investments Pte Ltd

Enlarge R.C columns using Pre-packed Grouting Method (Non-Shrink Cementitious Grout) complete with aggregates for Envio Building.

Oct – Nov 11

Loh & Loh Construction Pte Ltd

Repair water leakage on construction joint and R.C soffit slab using Unifor Underwater Epoxy Grouting Method for SLNG Jurong Island Project.

Oct – Nov 11

Marina Properties Pte Ltd

Repair water leakage on R.C soffit slab at #Unit 02-48 using Polyurethane Grouting Method at Millenia Walk.

Oct 11 – Jul 12

Sembawang Engineers & Construction Pte Ltd

Repair hollow screed on R.C floor at The Beach Villa using Unifor Epoxy Grouting Method for Sentosa MC06 Project.

Nov 11 – May 12

Dongah Geological Engineering Co Ltd

Repair water Leakage from starter bar area on diaphragm wall inside cut and cover tunnel using Polyurethane Grouting Method for MCE C482 Project.\r\n

Nov – Mar 11

Hong Yang Development Pte Ltd

Drill holes on CBP for Vacanza @ East Project.

Nov-11

Sato Kogyo (S) Pte Ltd

Grout void behind timber lagging using OPC complete with admixture for Sentosa Gateway (ER295) Project.\r\n\r\n\r\n

Nov 11 – Dec 11

Takenaka-Singapore Piling JV Pte Ltd

Grout Bored Pile using Epoxy Grouting Method for National Art Gallery Project.\r\n\r\n

Dec11 – Mar 15

Penta Ocean Construction Co. Ltd

Repair dry Cracks on R.C slab and wall using Unifor Crack Injection System (Epoxy Grouting Method) and repair water leakage from Cracks/Construction Joints / Honeycomb on R.C slab and wall using Unifor Underwater Epoxy Grouting method for NUH Medical Center.

Dec 11 – Nov 13

Marina Properties Pte Ltd

Repair leakage from cracks and construction joints on R.C slab at Basement Carpark for Millenia Walk using Unifor Underwater Epoxy Grouting Method.

Dec 11 – Jul 12

Marina Properties Pte Ltd

Repair dry cracks and water leakage on R.C slab for Millenia Walk Carpark Project using Unifor Crack Injection System (Epoxy Grouting).

Dec 11 – Jul 12