Kingsland Development Pte Ltd
Repair water leakage from honeycomb on R.C soffit using Polyurethane Grouting Method c/w Unifor Crystallization system at Jln Jentera Factory.
Jan 11Marina Bay Sands Pte Ltd
Repair water leakage to Diaphragm wall, R.C Soffit, Construction Joints & around reinforcement bars using Polyurethane Grouting Method at Marina Bay Sands
Jan – Feb 11Sembawang Engineers & Constructors Pte Ltd
Repair dry crack on R.C Wall & Slab using Unifor Crack Injection System (UF Grout); repair water leakage on R.C Wall & Slab using Unifor Underwater Epoxy Grouting Method (UF Grout UW); repair honeycomb on R.C Wall & Slab using Cementitious Pressure Grouting Method for Resort World Sentosa MC06.
Jan 11 – May 12Kian Hiap Construction Pte Ltd
Repair water leakage from cracks, construction joint & honeycomb on Diaphragm wall using Polyurethane Grouting Method at Alexis Condominium.
Feb – Mar 11Sato Kogyo (S) Pte Ltd
Repair cracks on Soffit R.C. Slab and column using Unifor Crack Injection System (Epoxy Grouting) for International Cruise Project.
Feb 11 – Mar 12CEC Engineering Pte Ltd
Repair water leakage from cracks on R.C Soffit slab at Marina IR (North Podium) Project using Polyurethane Grouting\r\nMethod and repair honeycomb at R.C Lift Core Wall using Pressure Grouting Method at OUB Centre.
Feb 11McConnell Dowell (SEA) Pte Ltd
Repair cracks on R.C Wall Panel at current training wall using Underwater Epoxy Grouting Method at International Cruise Terminal.
Mar 11Taisei Corporation
Repair water leakages on diaphragm wall inside cut and cover station using Polyurethane Grouting Method for CCL C854, Farrer Station Project.
Mar – Jun 11Orchard 290 Ltd
Install Seal onto the expansion joint using Zealseal c/w epoxy mortar and center ball at 6th Floor Level Garden Area.
Mar – Apr 11Civil Aviation Authority of Singapore
Repair water Leakage on Construction Joint using Polyurethane Grouting at Changi Airport Terminals Project.
Mar – Jul 11Sato Kogyo (S) Pte Ltd
Grout gap between crane rail and beam at SATU (bay 2, 3 & 4) using Unifor Epoxy Grouting Method for Rolls-Royce Building.
Apr 11 – Jun 11Toh Teck Seng Engineering & Construction
Repair water leakage surrounding the cable on basement RC wall using Polyurethane Grouting Method in Jurong Island at Exxonmobil.
Apr – May 11Crystal Fowntains (D&P) Pte Ltd
Core hole on R.C. Wall, and pressure grout gap between pipe and R.C. wall after installation of pipe using non-shrink cementitious grout c/w underwater epoxy mortar for Sentosa MC06 Gondola Canal Project.
Apr – May 11Kajima Overseas Asia Pte Ltd
Repair dry cracks on R.C. slab using Unifor Crack Injection System (Epoxy Grouting); repair water leakage from cracks and honeycomb on R.C. slab using Unifor Underwater Epoxy Grouting method for SGH Pathology Building Project.
Apr 11 – May 13Capstone Construction Pte Ltd
Repair honeycomb on R.C. wall and slab using Pressure grouting method (non-shrink cementitious grout) for Bethel Church Project.
Apr – Aug 11Marina Properties
Repair water leakage on R.C soffit slab using Polyurethane grouting method for Millenia Walk, Ritz Carlton, Millennia Tower Project.
May 11 – Jul 12Samsung-Tiong Seng JV
Repair dry cracks on R.C. wall using Unifor Crack Injection System (Epoxy Grouting) for The Connexion Project.
June 11 – Jan 14Chosuk Construction & Development Pte Ltd
Repair water leakage from secant pile at shaft A using polyurethane grouting method for MRT Downtown Line C915 Project.
June 11Incorporated Builders Pte Ltd
Repair water leakage from downpipe on R.C. slab using Polyurethane Grouting Method for Singapore Polytechnic Project.
June 11Corrosion Proof Construction (Asia) Pte Ltd
Repair dry cracks on R.C. slab test bed using Unifor Crack Injection System (Epoxy Grouting) to Rolls Royce Building at Seletar.
June – Aug 11Eng Lee Engineering Pte Ltd
Grout water leakage on cracks inside segment tunnel using Polyurethane Grouting Method and Unifor Crack Injection System (UF Grout UW) at Tuas Project.
July – Dec 11Keong Hong Construction Pte ltd
Repair Hollow Marble using Unifor Epoxy Grouting Method for No.8 Woodleigh Close Condominium Project.
Aug 11Dongah Geological Engineering Co Ltd
Repair water leakage on diaphragm wall inside cut and cover tunnel using Polyurethane Grouting Method for MCE C482.
Sep 11 – Mar 12Loh & Loh Construction Pte Ltd
Repair dry cracks on R.C soffit slab using Unifor Crack Injection System (Epoxy Grouting Method) and water leakage on construction joint and R.C soffit slab using Unifor Underwater Epoxy Grouting Method for SLNG Jurong Island Project.
Sep – Nov 11Kimly Construction Pte Ltd
Repair water leakage from cracks / construction joints and honeycomb on R.C slab and wall using Unifor Underwater Epoxy Grouting Method and Polyurethane Grouting Method for the Pavilion Project.\r\n
Oct 11 – Nov 11Takenaka –Singapore Piling JV
Grout gap between R.C hole/reinforcement bar and steel pile using Epoxy Grouting Method and Non-Shrink Cementitious Grouting Method for the National Art Gallery.
Oct 11 – May 15Sato Kogyo (S)Pte Ltd
Enlarge columns at Block D using Pre-pack Grouting Method (Non-Shrink Cementitious Grout); repair wet cracks on R.C water tank using Polyurethane Grouting Method; repair dry cracks on R.C slab using Unifor Crack Injection System (Epoxy Grouting) for the PLAZA Project.
Nov 11 – Dec 13Prima Food Pte Ltd
Repair cracks on R.C slab using Unifor Crack Injection System Epoxy Grouting Method for Prima Annex Building .
Oct – Dec 11JCP Investments Pte Ltd
Enlarge R.C columns using Pre-packed Grouting Method (Non-Shrink Cementitious Grout) complete with aggregates for Envio Building.
Oct – Nov 11Loh & Loh Construction Pte Ltd
Repair water leakage on construction joint and R.C soffit slab using Unifor Underwater Epoxy Grouting Method for SLNG Jurong Island Project.
Oct – Nov 11Marina Properties Pte Ltd
Repair water leakage on R.C soffit slab at #Unit 02-48 using Polyurethane Grouting Method at Millenia Walk.
Oct 11 – Jul 12Sembawang Engineers & Construction Pte Ltd
Repair hollow screed on R.C floor at The Beach Villa using Unifor Epoxy Grouting Method for Sentosa MC06 Project.
Nov 11 – May 12Dongah Geological Engineering Co Ltd
Repair water Leakage from starter bar area on diaphragm wall inside cut and cover tunnel using Polyurethane Grouting Method for MCE C482 Project.\r\n
Nov – Mar 11Hong Yang Development Pte Ltd
Drill holes on CBP for Vacanza @ East Project.
Nov-11Sato Kogyo (S) Pte Ltd
Grout void behind timber lagging using OPC complete with admixture for Sentosa Gateway (ER295) Project.\r\n\r\n\r\n
Nov 11 – Dec 11Takenaka-Singapore Piling JV Pte Ltd
Grout Bored Pile using Epoxy Grouting Method for National Art Gallery Project.\r\n\r\n
Dec11 – Mar 15Penta Ocean Construction Co. Ltd
Repair dry Cracks on R.C slab and wall using Unifor Crack Injection System (Epoxy Grouting Method) and repair water leakage from Cracks/Construction Joints / Honeycomb on R.C slab and wall using Unifor Underwater Epoxy Grouting method for NUH Medical Center.
Dec 11 – Nov 13Marina Properties Pte Ltd
Repair leakage from cracks and construction joints on R.C slab at Basement Carpark for Millenia Walk using Unifor Underwater Epoxy Grouting Method.
Dec 11 – Jul 12Marina Properties Pte Ltd
Repair dry cracks and water leakage on R.C slab for Millenia Walk Carpark Project using Unifor Crack Injection System (Epoxy Grouting).
Dec 11 – Jul 12