Project Done

Ando Singapore Pte Ltd

Repair dry cracks on R.C soffit slab at carpark, NUS-EDU SPORTS Project using Unifor Crack Injection System (Epoxy Grouting Method); and repair wet cracks on joints and R.C soffit slab at carpark, using Unifor Polyurethane Grouting Method for NUS-EDU SPORTS Project.

Jan - Jul 12

Kimly Construction Pte Ltd

Grout gap between R.C slab and R.C Column/ Wall using Pre-packed Grouting Method (Non-Shrink Cementitious Grout) at Vermont Project.

Feb 12 – Sep 13

Eng Lee Construction Pte Ltd

Repair dry cracks using Unifor Crack Injection System for Changi Airport Terminal 3 Project.

Apr 12

Yau Lee Construction (S) Pte Ltd

Repair water leakage from cracks/construction joint and honeycomb using Unifor Polyurethane Grouting Method at The Greenwich.

May 12 – Feb 13

Raycolt Engineering Pte Ltd

Grout gap between FRP and closed cell foam using Unifor Underwater Epoxy Grouting Method (UF Grout UW) for Sentosa MC-06 Project.

Apr 12

Sato Kogyo (S) Pte Ltd

Grout gap between primary/secondary R.C beam and façade wall using Unifor Pressure Grouting Method for Victoria Theatre Project.

Mar 12 – May 14

Joo Siang & Co Pte Ltd

Repair cracks on R.C wall using Unifor Cracks Injection System (Epoxy Grouting) at Exxonmobil in Jurong Island.

May – Jun 12

2K Builder Pte Ltd

Repair water leakage from cracks, honeycomb and construction joint on box culvert soffit at Canberra Link/ Sembawang.

May 12

Seletar Country Club

Repair water leakage from construction joint between wall and slab using Unifor Underwater Epoxy Grouting Method for Seletar Country Club Sports Complex Project.

July 12

Hydrotechs Mechanical and Electrically Service Pte Ltd

Grout opening on R.C. wall using Cementitious Pre-packed Grouting Method for Greenwich Project.

July 12

Sato Kogyo (S) Pte Ltd

Grout between R.C. beam and column using Cementitious Pre-packed Grouting Method for Royal-Beach Road Project.

Aug 12 – Sep 13

Wai Fong Construction Pte Ltd

Grout gap between R.C. slab soffit and wall inside cut and cover tunnel using Non-Shrink Cementitious Pressure Grouting Method for MCE C482 Project.

Aug 12

Hexacon Construction Pte Ltd

Repair dry cracks on R.C. slab at Tower 1 & 2 using Unifor Crack Injection System (Epoxy Grouting) for the Vision Project.

Sept – Dec 12

Dongah Geological Engineering Co Ltd

Repair dry cracks on R.C. wall/slab and segment inside tunnel using Unifor Crack Injection System (Epoxy Grouting); repair water leakage in ring segment tunnel using Polyurethane Grouting; repair spalling concrete on segment tunnel using Unifor Patching Method (UF Seal); repair water leakage on segment cracks inside tunnel using Unifor Underwater Epoxy Grouting Method & Polyurethane Grouting Method for MRT DTL2 C913 Project.

Sept 12 – Jan 13

2K Builder Pte Ltd

Repair water leakage from construction joint on box culvert soffit using Unifor Polyurethane Grouting Method for Jurong Island (Tembusu Crescent) Project.

Oct 12

Ssangyong Engineering & Construction Co Ltd

Repair dry cracks on R.C. wall & slab using Unifor Crack Injection System (Epoxy Grouting); repair water leakage from cracks/construction joints & honeycomb using Unifor Underwater Epoxy Grouting Method (UF Grout UW) and Polyurethane Grouting Method; repair honeycomb on R.C. wall & slab using Non-Shrink Cementitious Pressure Grouting Method for Bedok Mixed Development Project.

Sept 12 – Feb 13

TREVI S.p.A Singapore Branch

Repair honeycomb on diaphragm wall using Non-Shrink Cementitious Pressure Grouting Method for MRT DTL Stage 3 C925A Project.

Oct – Nov 12

Hyundai Engineering & Construction Co Ltd

Repair water leakage from R.C. slab at Carpark using Polyurethane Grouting Method for Costa Del Sol Condominium Project.

Oct 12

Sato Kogyo (S) Pte Ltd

Repair water leakage on R.C. Bridging Panel Wall inside cut and cover station using Unifor Polyurethane Grouting Method for MRT DTL3 C928 Bedok Town Park Station Project.

Oct 12 – On going

Zap Piling Pte Ltd

Repair water leakage from Secant Bore Pile using Unifor Polyurethane Grouting Method (Hycel UF-08) for Victoria Theatre Project.

Nov 12 – Apr 13

Zap Piling Pte Ltd

Repair water leakage from Secant Bore Pile using Unifor Polyurethane Grouting Method (Hycel UF-08) for Victoria Theatre Project.

Nov 12 – Apr 13

Sato Kogyo (S) Pte Ltd

Grout gap between R.C. beam and steel plate using non-shrink cementitious grouting method for Marina Square A&A Project.

Dec 12