Project Done

Daewoo E & C

Repair water leakage on cracks / construction joints on R.C. soffit using Unifor Polyurethane Grouting Method for One Balmoral Project.

Jan 15

Jeks Engineering Pte Ltd

Repair dry cracks on R.C. slab soffit using Unifor Crack Injection System (Epoxy Grouting) for Changi Airport T4 Project.

Jan 15

Prima Limited

Repair water leakage on construction joint / cracks at lift pit and slab on R.C water tank using Unifor Polyurethane Grouting Method for Mill Building Project.

Jan 15 – on going

Hyundai Engineering & Construction Co Ltd

Repair water leakage between segment to segment joint inside bored tunnel using Unifor Polyurethane Grouting Method (Hycel UF-08); repair water leakage on cracks / honeycomb / construction joints inside cut and cover tunnel using Unifor Underwater Epoxy Grouting Method (UF Grout UW); repair dry cracks on R.C. wall at station and inside cut and cover tunnel using Unifor Crack Injection System (Epoxy Grouting Method) for MRT DTL3 C931 Project.

March 15 – on going

SK E&C Singapore Branch

Repair water leakage from void behind segment using Unifor Polyurethane Grouting Method (Hycel UF-08) for Cable Tunnel EW2 Project.

April 15

GS Engineering & Construction

Repair water leakage on cracks / construction joints / R.C. wall and soffit using Unifor Underwater Epoxy Grouting Method (UF Grout UW) and Unifor Polyurethane Grouting Method; and dry cracks on R.C. wall/ soffit/ slab using Unifor Crack Injection System (Epoxy Grouting Method) for MRT DTL3 C925 Project.

May 15 – on going