Kingsland Development Pte Ltd

Repair water leakage from construction joint of R.C. slab and beam using Polyurethane Grouting Method at 12A Jalan Samulun.

Jan 2010

Quek & Quek Civil Engineering Pte Ltd

Repair hollow plaster and dry cracks on R C wall using Unifor Pinning Method for 59 Shipyard Road SMLS Project.

Jan 2010 - Feb 2010

Penta Ocean Construction Co., Ltd

Pressure Grout gap between steel plate and R.C. column using Cementitious Pressure Grouting Method for Marina Promenade 8400 Project.

Jan 2010 - Mar 2011

Taisei Corporation

Repair dry cracks on R.C. soffit slab & wall inside Cut & Cover Tunnel using Unifor Crack Injection System, and repair water leakage from cracks, construction joint and honeycomb on R.C. soffit slab & wall inside Cut & Cover Tunnel using Unifor Underwater Epoxy Grouting Method for MRT CCL4 C854 Bukit Brown Station Project.

Jan 2010 - Feb 2010

Jia Construction Co., Pte Ltd

Repair spalling concrete on existing R.C. column using Pressure Grouting Method & Patching Method, pressure grout gap between existing R.C. beam & wall using Pressure Grouting Method, and repair dry cracks on R.C. beam using Unifor Crack Injection System for No. 33 & 34 Boat Quay Project.

Jan 2010 - Feb 2010

Taisei Corporation

Repair water leakage on basement R.C. wall & soffit slab at Inner Bound wall & Soffit for MRT CCL4 C854 Thomson Station Project.

Feb 2010 - May 2011

Hyundai Engineering & Construction Co., Ltd

Repair dry cracks on R.C. slab, R.C. beam & R.C. wall using Unifor Crack Injection System; repair wet cracks on R.C. slab, R.C. beam & R.C. wall using Unifor Underwater Epoxy Grouting Method; and repair water leakage on honeycomb, cracks & Construction joint on basement water tank using Polyurethane Grouting Method for Overseas Union House Project.

Feb 2010 - Nov 2011

The MCST Plan No. 3448

Repair water leakage on cracks, honeycomb and construction joint at Tower 1 Lobby A Lift Shaft at Orchard Scotts.

Mar 2010

The Screening Room

Repair cracks on beam using Unifor Crack Injection System at No. 12 Ann Siang Road.

Mar 2010

Taisei Corporation

Repair water leakage on Basement R.C. wall & soffit slab at Inner Bound Wall & soffit using Polyurethane Grouting Method for MRT CCL4 C854 Botanic Garden Station Project.

Mar 2010 - May 2011

Marina Properties Pte Ltd

Repair water leakage on R.C. slab at Level 3 Parco using Polyurethane Grouting Method for Millenia Walk Project.

Mar - Sep 2010

PH Hydraulics & Engineering Pte Ltd

Coring holes and install anchor botts with on R.C. floor slab and wall at Level 1 and basement 1 for Resort Wall Sentosa Crane Project and Grout gap between steel plate and R.C. slab at Level 1 for Sentosa Crane Dance Project.

Apr 10 - Oct 10

Kimly Construction Pte Ltd

Grout gap between RC column and RC slab for Sengkang HDB Contract 16 Project using Pressure Grouting Method (Non-Shrink Cementitious Grout) at Fernvale Road.

Apr 10

Toh Teck Seng Engineering & Construction Pte Ltd

Repair waterleakage on pipe penetration to valve pits using polyurethane grouting method and repair dry cracks on R.C. wall using Unifor Crack Injection System at Exxon Mobil in Jurong Island.

Apr 2010- May 2011

L&M Foundation Specialist Pte Ltd

Repair to waterleakage on R.C. Skin Wall & Diaphragm Wall inside cut and cover tunnel using using Polyurethane Grouting Method for MRT Circle Line Stage 4 C856 Project.

May - Nov 2010

Greatearth Construction Pte Ltd

Repair dry cracks on R.C. slab at Ascentia Sky Condominium Project at Alexandra Road using Unifor Crack Injection System (Epoxy Grouting Method).

May 2010 - Jan 2011

Kingsland Development Pte Ltd

Repair dry cracks on R.C Soffit Slab for No.20 using Unifor Crack Injection System (Epoxy Method) Kranji Crescent Factory Project.

May - Jun 10

Greatearth Construction Pte Ltd

Repair dry cracks on R.C slab using Unifor Crack Injection System (UF Grout UW) for Sembawang Shopping Centre Project.

Jun - Jul 2010

Marina Properties Pte Ltd

Sealing of gap (10mm wide) between zinc roof and reinforced concrete at rooftop using Hilti CF 1750 and sealant for Millenia Tower Project.

Jun - Aug 10

Daelim Industrial Co Ltd

Grout water leakage surrounding R.C. Bored Pile and inside Bored Pile using Unifor Underwater Epoxy Grouting Method at MCE C487.

Jul - Sep 2010

Bachy Soletanche S’pore Pte Ltd

Repair water leakages on R.C Skin Wall & Diaphrapm Wall inside cut & cover station & tunnel using Polyurethane Grouting Method for MRT Circle Line & Downtown Line Project.

July 10 – Aug 10

Kimly Construction Pte Ltd

Repair honeycomb on R.C Wall & Column using Cementitious Pressure Grouting Method for Tresalveo Condominium Project.

July 10 – Feb 12

Sato Kogyo (S) Pte Ltd

Grout water leakage on construction joint for Rolls-Royce Building at Selestar using Polyurethane Grouting Method.

Aug 10 – Jun 11

Sato Kogyo (S) Pte Ltd

To cut 25mm wide V-Groove along dry crack & seal with epoxy mortar (UF Seal) on R.C Crosshead from Boon Lay to Joo Koon for C1280 BLE MRT Project.

Aug 10 – Oct 10

Winning Flag Enterprise Pte Ltd

Repair honeycomb on R.C footing at Central Plaza for Singapore Polytechnic using Non-Shrink Cementitious Pressure Grouting Method.

Aug 10

Wang Fung Construction Pte Ltd

Repair water leakage on cracks & construction joint using Polyurethane Grouting Method at Church of Jesus Christ of Latter Day Saints Project.

Aug 10- Dec 10

Kimly Constructionn Pte Ltd

Repair honeycomb on R.C Wall & Column using Conbextra Standard for Killiney Condominium Project.

Aug 10- Dec 10

Hexacon Construction Pte Ltd

Repair dry cracks on R.C Soffit at Basement using Unifor Crack Injection System (Epoxy Grouting) 1 & 2 at Cultural & Commercial Building Project.

Sep 10 – Nov 11

Commercial Industrial Suppliers & Services Pte Ltd

To grout cracks on one layer cell-com block wall using Unifor Crack Injection System (Epoxy Grouting) at Changi-Airport Terminal 3 building.

Oct 10 – Nov 11

The World Red Swastika Society

To grout water leakage on construction joint using Polyurethane Grouting Method at 3rd storey R.C Soffit t No. 76 Keng Lee Road, Swastika Buiding.

Oct 10

Saigon Metropolitan Tower Ltd

Repair cracks on R.C. Slab at basement using Unifor Crack Injection System (UF Grout UW) at Metropolitan Tower in Ho Chi Minh City, Vietnam.

Oct 10 – Jan 11

Penta-Ocean Construction Co., Ltd

To repair water leakage on R.C Water Tank using Polyurethane Grouting Method at Exxon Mobil in Jurong Island.

Nov 10 – Feb 11

Strainstall Singapore Pte Ltd

To grout gap in Bored Pile using Epoxy Grouting Method (UF Grout) and using Non-Shrink Cementitious Grouting Method for Sky Suite at Enggor Street Project.

Dec 10

Greatearth Construction Pte Ltd

To grout precast joint of water tank at AMK St 52 using Cementitious Pressure Grouting Method.

Dec 10

Cyclect Electrical Engineering Pte Ltd

Core holes on floor slab at Level 1 substation for Fujioil Core-Generator Plant Project.

Dec 10