Bestem Construction Pte Ltd
Repair water leakage on cracks/ construction joints on R.C. Soffit using Unifor Polyurethane Grouting Method for Capitol Building Project.
Jan 14– Jun 14GS E&C - TSC JV
Repair dry cracks on RC wall/slab inside cut and cover station using Unifor Crack Injection System; repair water leakage on cracks/honeycomb/construction joints inside cut and cover station using Unifor Polyurethane and Underwater Epoxy Grouting Method, repair dampness on floor slab (screed) using Unifor Crystallization System; repair hollow screed using Unifor Epoxy Grouting Method for MRT DTL2 C913 Project.
Jan 14 - Oct 15Tong Lee Engineering Works Pte Ltd
Repair honeycomb on R.C Column/ Beam and Slab using Non-Shrink Cementitious Pressure Grouting Method for Buroh Street Project.
Feb 14 – Aug 14Sato Kogyo (S) Pte Ltd
Repair water leakage from joint between D-Wall and R.C segment at tunnel eye area using Unifor Polyurethane Grouting Method; to seal gap joint between segment to segment using Polyurethane and Non-Shrink Cementitious Grouting Method for MRT DTL3 C932 Project.
Jun 14 - on goingSA E& C Pte Ltd
Grout steel plate gap of Tower Crane base using Unifor Epoxy Grouting Method for Marina One Project.
Jun 14Daewoo E & C
Repair water leakage on cracks/ construction joints on R.C soffit Unifor Polyurethane Grouting Method and Unifor Underwater Epoxy Grouting Method for Scotts Tower Project.
July 14 – Oct 14Sato Kogyo (S) Pte Ltd
Repair cracks for R.C Soffit & Slab using Unifor Crack Injection System (Epoxy Grouting Method) and Patching Method; to repair honeycomb on R.C Column/ Beam and Slab using Non-Shrink Cementitious Grouting Method for Nicoll Highway Project.
Jun 14 – on goingMcConnell Dowell South East Asia Pte Ltd
Repair water leakage from cracks/ honeycomb/ construction joints on R.C Slab & Wall inside cut & cover station using Unifor Polyurethane Grouting Method and Unifor Underwater Epoxy Grouting Method; to grout regroutable tube on slab at Six Avenue Station for MRT DTL C917A Project.
July 14 – Oct 14Takenaka Corporation
Grout base plate gap using Non-Shrink Cementitious Grouting Method and repair dry cracks on R.C. slab using Unifor Crack Injection System (Epoxy Grouting) for Changi Airport Terminal 4 Project.
Aug 14 - ongoing